Harrod’s Village Estate, Barnes, London, SW13

Planned Preventative Maintenance Schedule

Base Building Consultancy were instructed by Rendall & Rittner, on behalf of the Village Estate Management Company to produce a Planned Preventative Maintenance Schedule over a 20 year period for the entire Harrod’s Village Estate in Barnes.

The Harrods Village Estate comprises of 10 separate private residential blocks within the estate, each differing in style and construction.  Many of which had been converted from the old Harrod’s depository buildings.

Base Building Consultancy carried out a full inspection of the estate, which included the external building fabric and internal common parts of all the residents properties in each block.  The estate grounds were also included within the Planned Preventative Maintenance Schedule, which included the reviewing of the estate roads, hardstanding’s, pavements, boundary walls and fences and all outbuildings and plant rooms within the boundary of the estate. The Mechanical and Electrical elements were also reviewed, which included fire safety components, lighting and electrical components, water treatment and lift maintenance, modernisation and replacement options.

The Client also requested that we allow for an irrigation system to be incorporated within the Schedule. Base Building Consultancy sourced and obtained quotes to install an irrigation system to the estate grounds with was included within the 20 year plan.

The Planned Preventative Maintenance Schedules provided details of all components, their life cycles and potential defects/failures in addition to providing a detailed spreadsheet providing estimated costs to carry out repairs/maintenance of all components and is used to aid budgeting and planning of future maintenance works. It also includes cyclical internal and external repairs & decoration programmes in accordance with lease agreements.

Electronic and hard copies of the Planned Preventative Maintenance Schedule were issued to the client with meetings held with the Client and Board of directors upon completion of the Schedule to discuss the future maintenance works.

Project Details

Harrod's Village Estate
Trinity Church Road
Barnes
London SW16

  • Asset Management Plan
  • Capex Plan
  • Planned Preventative Maintenance Schedule