48 Myrdle Street, Poplar, London, E1

Base Building Consultancy were contacted by Y & Y Management to prepare a specification of works in relation to the external repairs and decoration to 48 Myrdle Street.

Denman House, Lordship Terrace, Stoke Newington, N16

Base Building Consultancy were contacted by Grainger PLC  to prepare a planning application for the construction of additional Bin Stores and Storage Sheds to the Denman House Estate in Stoke Newington. The Client sought to provide additional bin stores and storage sheds for the residents at Denman House.  Base Building Consultancy Liaised with the Client to determine their expectations and specifications of the new bin and storage sheds. A detailed survey was undertaken of the premises and a complete design package was produced which included full planning drawings which were submitted to and approved by Hackney Borough Council. Base Building…

London Buddhist Centre, Roman Road, London, E2

Base Building Consultancy were instructed by The London Buddhist Centre to produce a specification of works in relation to the external repairs and decorations to the London Buddhist Centre in Bethnal Green. The London Buddhist Centre is a six storey Grade II listed Victorian building and is located in the Globe Road conservation area.  The storeys are arranged over basement and five upper floors. The client also wished to address issues with roof leaks and repairs to the chimney stacks.  Generally works included local repairs to brickwork, joinery, glazing, roof coverings, gutters, lead flashings, ironmongery and decorations. Base Building Consultancy has vast experience in…

216-263 Wilmot Street, London, E2

Base Building Consultancy were instructed by Rendall & Rittner to inspect the condition of the existing flat roof to 216-263 Wilmot Street and provide recommendations in regard to the repair or replacement of the roof. 216 to 263 Wilmot Street comprises of a Victorian private residential block of 48 flats constructed in the 1850’s. The block extends over five storeys and is constructed in a traditional manner using solid load bearing brickwork ranging from 215mm to 330mm thick brickwork for the external walls. The client wished to procure a high quality and durable external waterproof roof finish, and to carry out…

City Point, The Apex, 59 Bunhill Row, EC1Y

Base Building Consultancy were contacted by Firstport Property Services to inspect the condition of the existing flat roof to City Point, The Apex, 59 Bunhill Row in Old Street and provide recommendations in regard to repair or replacement of the roof. The Client also sought to improve access arrangements through the installation of a new access hatch and CAT ladder to the roof. 59 Bunhill Row comprises a block of residential flats located in the centre of London. The block is ‘L’ shaped is located on the corner of Bunhill Row and Featherstone Street. The Client wanted to address issues with the two…

Wollaton & Newstead House, London, Islington, N1

Base Building Consultancy were instructed by Rendall & Rittner to prepare a specification of works relating to the External Repairs & Decorations required to both Wollaton House and Newstead House on the Angel School Estate in Islington. The Angel School Estate, comprises a mixture of freehold and leasehold properties, throughout the estate. Wollaton House comprises a converted school building comprising 35 Flats, and Newton House comprise a purpose built block of 25 Flats. Other parts of the estate comprise Town Houses, located on Batchelor Street, and Ritchie Street. A further small block of flats is located within the estate, namely the…

Macaulay Court, Macaulay Road, London, SW4

Base Building consultancy were contacted by Rendall & Rittner to prepare a specification of works relating to the External Repairs and Decorations required to Macaulay Court in Clapham. Macaulay Court comprises of a purpose built private residential block of 29 flats constructed in the 1920’s.  The block extends over five storeys and is concrete framed with a mixture of rendered finishes to the upper floors and exposed brickwork walls to the lower floors. Base Building Consultancy carried out a detailed survey of the premises identifying any problems or defects throughout the estate. The Client wished to address several issues with…

Pump House Estate, Renforth Street, London, SE16

Base Building Consultancy were instructed by Rendall & Rittner to prepare a specification of works relating to external repairs and decorations required at Pump House, Renforth Street. The premises comprise a number of separate residential leasehold properties within the Pump House Estate surrounding a cobbled car parking courtyard area. Generally works included local repairs to brickwork, joinery, roof coverings, gutters, lead flashings and decorations. A specific defect that was identified to be remedied, was surface water leaking into the below ground car park through the courtyard slab. Base Building Consultancy has vast experience in preparing specifications of work for external…

1-180 Wilmot Street, London, E2 0BU

Base Building Consultancy were contacted by Rendall & Rittner to investigate the options available to remedy defective windows at 1-180 Wilmot Street, which comprise two separate blocks of privately owned leasehold flats. Panes of glass had been falling out of casement windows creating severe health and safety issues. Via consultation meetings with Rendell & Rittner and the Freeholder (the Residents Committee members) Repair vs Replacement was considered and the latter was chosen as the preferred option. Base Building Consultancy are well experienced in preparing planning applications and planning and monitoring large projects. Having such knowledge enabled us to advise on…

Old Park Lane, London, W1K

Base Building Consultancy was instructed to prepare terminal schedules of dilapidations on behalf of the Landlord, on various office suites within this large occupied commercial building located in Mayfair. Concurrent to negotiating settlements with outgoing Tenants, we prepared specifications of refurbishment works on the office suites, the communal WCs, lift landings, main staircase, main reception, board room and kitchen. The works were split into 3 phases. Phase 1 was competitively tendered, with phases 2 & 3 negotiated based on the Phase 1 costs. Each phase of work was notified to the HSE. Base Building Consultancy’s dilapidations expertise ensured that the…